EXTRACTION WORKSHOP, COPPER PLANT OF BENKALA DEPOSIT
KAZСOPPER LLP
36.5 BLN KZT
CONSTRUCTION OF AN EXTRACTION WORKSHOP, DESIGN, SUPPLY, INSTALLATION, COMMISSIONING IN BEINEU
• Automatic fire extinguishing systems • Fire and gas detection, warning system
Back
BUILDING UTILITIES, FINISHING WORKS
KAZМОRTRANSFLOТ LLP
15 BLN KZT
• Finishing works • Automatic fire extinguishing systems • Fire alarm systems • Video surveillance and access control systems • Gas detection systems • Automation of the heating and ventilation system • Power supply systems • Structured cabling system • Transformer substation
Back
DESIGN AND COMMISSIONING OF THE COAL TRANSPORTATION SYSTEM
EKIBASTUZ REGIONAL POWER STATION-2
160,7 BLN KZT
DESIGN, COMMISSIONING OF A TELESCOPIC HANDLER WITH A BUILT-IN ASPIRATION SYSTEM Ekibastuz RPS-2 is the second thermal power plant in the city of Ekibastuz, in Pavlodar region of Kazakhstan.
ERPS-2 generates power from high-ash Ekibastuz coal by two 500 MW power units with an installed capacity of 1000 MW.
Development of a project for coal transportation and unloading systems
Installation and commissioning of telescopic handlers with a built-in aspiration system
Back
COMPREHENSIVE MODERNIZATION OF SECURITY SYSTEMS
ATYRAU OIL REFINERY
740 BLN KZT
COMPREHENSIVE MODERNIZATION, SUPPLY, INSTALLATION, COMMISSIONING OF FIRE SAFETY SYSTEMS
Development of a project for the comprehensive modernization of systems
Supply, installation, commissioning of comprehensive fire safety systems
Automatic foam fire fighting
Automatic fire alarm
Gas detection
Back
EXTRACTION WORKSHOP, COPPER PLANT OF BENKALA DEPOSIT
KARABATAN INTEGRATED GAS CHEMICAL FACILITY (FREE ECONOMIC ZONE)
KARABATAN UTILITY SOLUTIONS LLP
6,7 BLN US DOLLARS
DEVELOPMENT OF A COMPREHENSIVE FIRE SAFETY SYSTEM PROJECT. SUPPLY, SITE SUPERVISION AND COMMISSIONING . • DOOSAN project adaptation • Automatic water fire extinguishing systems • Automatic gaseous fire suppression systems IG541 • Automatic fire alarm systems • Gas detection systems.
Back
BITUMEN PLANT IN AKTAU
CASPI BITUM JV LLP
52 BLN KZT
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF SAFETY SYSTEMS AT THE BITUMEN PLANT IN AKTAU
• Automatic fire extinguishing and fire alarm system • Access control system • Gas detection system • Construction and installation works.
Back
CONSTRUCTION OF A TRANSPORT AND LOGISTICS HUB IN ASTANA
COMPLEX GAS PROCESSING PLANT 40 000 m3/h KOZHASAY COMPRESSOR STATION
KAZTRANSGAZ LLP
21,2 BLN KZT
COMPREHENSIVE SUPPLY AND SITE SUPERVISION:
Automatic fire alarm systems (including production of control cabinets)
Assembly of automation cabinets
Automatic water, gas and foam fire extinguishing systems
Video surveillance and access control systems
Communication and telecommunication systems
Shut-off and control valves.
Back
6 COMPRESSOR STATIONS OF BEINEU-SHYMKENT MAIN GAS PIPELINE
BEINEU-SHYMKENT LLP
10 BLN KZT
GAS PIPELINE COMPRESSOR STATION
Design, supply, installation of comprehensive fire safety systems, gas detection systems, video surveillance, access control and management systems
General construction works on infrastructure development in rotation villages
Construction of utilities and water supply systems
Installation of steel work and cable racks
Systems of industrial and household wastewater treatment and water conditioning.
Back
CONSTRUCTION OF OFFICE AND AMENITY BUILDINGS OF EASTERN SARY-OBA MINE OF ZHILADINSKY PIT
KAZAKHMYS CORPORATION LLP
6 BLN KZT
EASTERN SARY-OBA
DESIGN SUPPLY CONSTRUCTION
Area of the fenced territory - 7,9 hectares Total area of buildings - 12 122 m2
• Office and amenity buildings • Amenity building • Lamp room • Health unit • Canteen for 200 seats • Inventory warehouse • Fire house • Warm pavilion • Treatment facilities • Pump unit • Portacabin boiler house • FOCL • Collector • Other facilities (+28)
Back
CONSTRUCTION OF OFFICES AND AMENITIES (GOLD-PROCESSING PLANT AND MINE) DZHAMGYR
AAE ENGINEERING
2 BLN KZT
DESIGN SUPPLY CONSTRUCTION
Office and amenity buildings: • Development area - 2303 m2 • Building are - 4152 m2 • Warm passageway – 121 m2 • Chemical analysis laboratory ( SGS) • Building area - 909 m2
DESIGN AND RECONSTRUCTION OF STROITEL HOTEL, BALAPAN SETTLEMENT
KARAZHYRA JSC
DESIGN SUPPLY CONSTRUCTION
• Development area - 1 221 m2 • Building area - 1 598 m2 • Architectural volume – 9 968 m2
TOTAL PROJECT COST: ≈ 1,5 BLN KZT
CANTEEN DESIGN, BALAPAN SETTLEMENT • Development area - 1 212 m2 • Building area - 1 728 m2 • Architectural volume – 9 196 m2
TOTAL PROJECT COST: ≈ 1,6 BLN KZT
Back
DESIGN AND CONSTRUCTION OF A CORE STORAGE WITH A LABORATORY IN ZHEZKAZGAN
KAZAKHMYS BARLAU JSC
5,5 BLN KZT
DESIGN SUPPLY CONSTRUCTION
• Land plot area - 7,7495 hectares • Total area of buildings - 10 070,39 m2 Including: • Core storage with a laboratory – 6 185,4 m2 • Training center with a museum – 1 678,2 m2 • Repair shop – 1 637,3 m2 • Boiler room – 569,49 m2 • Utilities • FOCL (7 km) • Collector (2,5 km) • Overhead circuit – 35 kV
Back
CONSTRUCTION OF A COPPER PRODUCTION PLANT BY SELECTIVE EXTRACTION AND ELECTROLYSIS (SX-EW) WITH A HEAP LEACHING SITE FOR PROCESSING OF COPPER ORES OF BERKARINSKOYE DEPOSIT LOCATED IN ALGABAS RURAL DISTRICT IN SEMEY, EAST KAZAKHSTAN REGION
ARX MINERALS LLP
11,5 BLN KZT
DESIGN AND CONSTRUCTION OF A ROTATION VILLAGE IN THE TERRITORY OF BERKARINSKOYE DEPOSIT
DESIGN
Draft design of a rotation village
Adjustment of a part of Berkarinsky mining and smelting enterprise
FACILITIES
No. 1 – Heap leaching site - 18,74 hectares Development area 79 794 m2
No. 2 – Solution processing site – 8,9 hectares Development area 6 900 m2
No. 3 – Rotation village site – 3,03 hectares Development area 1308,5 m2
Total area 61,67 hectares
Production capacity of the plant – 5800 tons/year
CONSTRUCTION OF A SULFURIC ACID WAREHOUSE WITH A CAPACITY OF 640 M3 LOCATED in the village of KARAGAILY
FACILITIES
Development area 748,94 m2
Total area 0,53 hectares
Warehouse volume – 640 m3
Back
DESIGN AND CONSTRUCTION OF AN ADDITION TO THE SC KANSK SPORTS COMPLEX IN ZHEZKAZGAN, ZHASTAR PARK – SC NAMYS
KAZAKHMYS CORPORATION LLP
2 BLN KZT
DESIGN SUPPLY CONSTRUCTION
CONSTRUCTION OF AN ADDITION TO THE SPORTS COMPLEX
Building area – 2 745 m2
Development area – 5 745 m2
Area of the territory within the boundaries of the site – 0,4715 hectares
Back
DESIGN AND RECONSTRUCTION OF STROITEL HOTEL, BALAPAN SETTLEMENT
CONSTRUCTION OF THE EVAPORATION POND NO. 1 FOR THE MINES “EASTERN SARY-OBA,” “WESTERN SARY-OBA” AND ITAUYZ, TAKING INTO ACCOUNT THE DISCHARGE OF MINE WATERS FROM THE KARASHOSHAK FIELD
KAZAKHMYS CORPORATION LLP
15 BLN KZT
WORK TYPES
Building a dam body from loan
Top soil cutting off, removal to the dump
Upstream slope fastening with rocky soil
Reverse filter, crushed stone roadbed
Sand reverse filter
Excavation of catch drains
Making a protective membrane
TECHNICAL AND ECONOMIC FEATURES
The volume of the evaporator pond is 22.5 million m3
The construction will take place in 3 stages.
The total area of the evaporator pond is 504.2 hectares
Maximum dam height - 17,6 m.
Crest width - 8,5 m
Back
SUPPLY, INSTALLATION AND COMMISSIONING OF THE AVRORA-2 MONOPULSE SECONDARY RADAR IN THE CITIES OF ATYRAU AND ARAL.
KAZAERONAVIGATSIYA RSE
2.9 BLN KZT
Laying utilities
Laying communication and telecommunication networks,
building the tower steelwork for the radar
Avrora-2 installation and commissioning (secondary radar)
Supply of a diesel generator unit
Comprehensive commissioning works
Landscaping of the territory
Back
TOPPING OF THE SLAG DISPOSAL DAM SECTIONS 1-2, SECTION 6
TOPAR RPS LLP
25 BLN KZT
Erection of the topping tier at the sections No. 1 , No. 2, and No. 6
Laying the pipelines for preparation and stamping production No. 1, 2, 3 and 4
Clarified water pipeline
Installation of switching,and drainage units, making shaft wells
Landscaping of the territory
Back
ROAD WORKS
1.3 BLN KZT
WORK TYPES
Repair of the Zhezkazgan runway
Major repair of the asphalt section of Molodyozhny open cut
Access road to the mines “Eastern Sary-Oba" and “Western Sary-Oba” - 23,2694 hectares
WATER SUPPLY TREATMENT FACILITIES AND TREATMENT FACILITIES FOR HOUSEHOLD, INDUSTRIAL AND SURFACE WASTEWATER
FACILITIES Eastern Sary-Oba
LOS-type waste treatment facilities for complete biological treatment, 350 m3/day
FTG-11 modular water treatment plant, m3/h (water supply treatment facilities)
Molodyozhny open cut
LOS-P-type waste treatment facilities for complete biological treatment, 558 m3/day
Back
REPLACING THE TURBOGENERATOR OF ST. NO. 3 WITH A К-130-8,8 TURBO GENERATOR
TOPAR RPS LLP
11.5 BLN KZT
Back
CONSTRUCTION OF A PLANT FOR THE PRODUCTION OF GEOSYNTHETIC MEMBRANES (GEOMEMBRANES) USING THE METHOD OF FLAT-SLOT DIE EXTRUSION FROM POLYETHYLENES IN ASTANA, ALMATY DISTRICT, INDUSTRIAL PARK, A194 STREET AREA
5 BLN KZT
PRODUCTION CAPACITY
Extrusion line for the production of geomembranes with a width from 6000 mm to 7500 mm, and a thickness from 0.5 mm to 3.0 mm.
The capacity of the line is 12,852 tons/year (1,500 kg/h) -1 k-t
The monthly output of one production line with a
geomembrane thickness of 1.0 mm is 0.7 million m2/year.
Back
СТРОИТЕЛЬСТВО НОВОГО СТАДИОНА В г.СТЕПНОГОРСК С ЗАМЕНОЙ ПОКРЫТИЙ БЕГОВЫХ ДОРОЖЕК И ФУТБОЛЬНОГО ПОЛЯ
6 BLN KZT
CONSTRUCTION OF A NEW STADIUM IN STEPNOGORSK WITH THE REPLACEMENT OF TRACK COATINGS AND FIELD TURF
The following types of work are planned to be carried out in Stepnogorsk:
Dismantling of existing structures
Construction of stands for 2000 seats with the necessary facilities under the stands
Construction of a modern football field with artificial turf and utilities
Landscaping
Access to sports events for persons with limited mobility
Back
WATER SUPPLY TREATMENT FACILITIES AND TREATMENT FACILITIES FOR HOUSEHOLD
CONSTRUCTION OF FLOOD EMBANKMENTS OF THE TAILING DUMP OF ZHEZKAZGAN CONCENTRATING MILLS NO. 1,2 FOR THE OPERATION PERIOD 2020-2024/ MAIN SLUDGE PIPES DN1200 MP-3 AND MP-4 (RELAYING AT 372,0-364,0 METERS ACCORDING TO THE BALTIC SYSTEM OF HEIGHTS) (PIPES, SUPPORTS)
4.3 BLN KZT
Installation of anchor and sliding compensator supports
Main sludge pipes - 9,8 km
Back
CONSTRUCTION OF THE KENGIR RESERVOIR EMBANKMENT in ZHEZKAZGAN
3 BLN KZT
Total cost of the land plot according to the state act – 48,9 hectares
DESIGN SUPPLY CONSTRUCTION
It is planned to build the following areas of the embankment: • Streetball court • Beaches • Promenade piers • Pumptracks • Parkour sites • Trade pavilions • Picnic areas / swing • Children’s playgrounds • Workout zones • Fitness zones • Trade pavilions • Bicycle tracks • Walkways and sidewalks
Back
REPLACEMENT OF THE TURBOGENERATOR OF ST NO. 4 WITH A K-130-8,8 TURBO GENERATOR FPR
TOPAR RPS LLP
DESIGN CONSTRUCTION The composition of the main equipment to be installed:
K-130-8.8 LMZ st. No. 4 instead of the existing turbine K100-90 st. No. 4
Generator ТZPF-130-2 UZ Elektrosila st. No. 4
Back
CONSTRUCTION OF FLOOD EMBANKMENTS OF THE TAILING DUMP OF ZHEZKAZGAN